Transport·NativePlanet·
Poor Road Conditions Near Chennai Metro Site in Indira Nagar, Adyar

Road conditions near the Chennai Metro Rail construction site at Indira Nagar in Adyar have deteriorated, affecting residents and commuters. The construction is part of the Metro's Phase II project, specifically Corridor 3 connecting Madhavaram and SIPCOT. Residents report that roads like Indira Nagar Second Avenue and parts of Third Avenue are severely damaged, complicating travel. The Adyar Kasturba Nagar-South Residents' Welfare Association highlights issues with reduced road space and uneven surfaces. Chennai Metro Rail Limited acknowledges the problem and plans to repair the roads soon.
Source: NativePlanet · Read the original →