Civic·The New Indian Express·

Tamil Nadu floats tenders for DPR on 4-km elevated corridor from Lighthouse to Adyar Thiru Vi Ka Bridge

Tamil Nadu: Tenders floated for DPR for corridor from Lighthouse to Thiru Vi Ka Bridge

The Tamil Nadu state highways department has floated tenders to prepare a detailed project report (DPR) for a proposed 4-kilometre elevated corridor stretching from the Lighthouse to the Adyar Thiru Vi Ka Bridge. Official documents reveal that Rs 38.10 lakh has been allocated for the exercise, and the appointed consultant must complete the work within 60 days of the contract being awarded.

The DPR will encompass engineering and economic feasibility studies for the elevated corridor, extension of an existing underpass, junction improvements, and construction of service roads. The consultant will also conduct traffic surveys at major junctions and assess the impact on connecting roads along the route.

The proposed corridor is intended to address severe congestion along Santhome High Road, Greenways Road, DGS Dinakaran Salai, and Durgabai Deshmukh Road. The stretch between RA Puram and Pattinapakkam is particularly congested, with several schools and religious institutions lining the route, making conventional road widening through land acquisition impractical, according to state highways department sources.

A similar proposal was floated last year by the Greater Chennai Corporation, which had suggested an elevated corridor from Pattinapakkam to the Thiru Vi Ka Bridge near Malar Hospital, passing through the Broken Bridge area along the Besant Nagar coastline and the Adyar Estuary. That proposal, however, did not progress beyond the planning stage.

A highways official noted that the final alignment of the corridor will be determined only after the DPR is ready. Key decisions — including whether to convert existing roads into one-way stretches and how to handle pillar construction along the coastline, which may require eviction and land acquisition — will also follow the completion of the report. The project additionally includes upgrades to major junctions, including the one at Pattinapakkam.

Source: The New Indian Express · Read the original →

Also reported by DT Next