Civic·DT Next·

TVK govt revives 4 km Light House to Adyar Bridge elevated corridor plan, floats DPR tender

TVK govt revives Light House to Adyar bridge elevated road plan

The Tamil Nadu state Highways Department has issued a tender to engage a consultancy firm for preparing a detailed project report (DPR) for a proposed 4 km elevated corridor connecting Light House to Thiru Vi Ka Bridge in Adyar. The consultancy contract is valued at Rs 38.10 lakh, with the selected firm required to complete the exercise within two months.

The proposed alignment runs through Pattinapakkam, an area where the TVK government has separately proposed to construct a new Secretariat. However, opposition from the local fishing community has cast uncertainty over the Secretariat site, which could in turn affect planning for the elevated corridor.

The latest move follows an announcement by Highways and PWD Minister Aadhav Arjuna in the Assembly on August 18, citing persistent traffic congestion along Santhome High Road — a key arterial route connecting Marina, Santhome, Raja Annamalaipuram, and Adyar. The minister had initially cited an estimated DPR cost of Rs 30 lakh; the tender now pegs it at Rs 38.10 lakh.

The scope of the DPR includes assessing engineering and economic feasibility, identifying a suitable alignment, examining the need to extend an existing underpass, improving junctions, and developing service roads. Traffic and pedestrian surveys, soil investigations, drainage studies, and mapping of underground utilities will also be conducted, along with cost estimates and land acquisition planning.

The project has a long and chequered history. The DMK government first proposed an elevated road from Light House to ECR near Kotivakkam in 2007, which was subsequently dropped by the AIADMK. In July 2019, then Chief Minister Edappadi K Palaniswami announced a corridor from Light House to Greams Road via Santhome High Road. In 2024, the DMK revived the proposal again, this time exploring a sea-facing alignment before the current route along the existing road was taken up.